Day 2

Our first night in the new house was a bit like camping. We started early this morning on the “makeover”. G’s mom and her partner are staying the week with us and helping fix up the house. Today G and K spent the day in the yard hacking down the trees and yanking them out. There is a huge tree and ivy that overgrew the shed in back, and all of is starting to come out. Inside the hallway, N and I worked on the peeling wallpaper. Scraping the wall by hand was pretty excruciating, but we managed to get a large section done within the day. I have classes during the day tomorrow, but in the evening its back to work! 🙂

 

The yard after a day of ripping through it

The yard after a day of ripping through it

The pile of branches cut down from above the shed

The pile of branches cut down from above the shed

A small plaque for our front door (from nel and kees )

A small plaque for our front door (from N & K)

K going to take down the first tree

 

Gerben takes down the first tree

G takes down the first tree

Hazardous flying trees may be in yard!

Hazardous flying trees may be in yard!

Removing one of the failing panels of wallpaper from the entryway

Removing one of the failing panels of wallpaper from the entryway

G ripping out the bamboo

K has conquered the jungle

One thought on “Day 2

Leave a Reply

Your email address will not be published. Required fields are marked *